Banner Images

TIP...
of the Iceberg

Protect your furnace!

Electrical surge protection is a common consideration for all our electronics in the home.

Our PROJECTS

Allied 40 kw Electric Boiler

Commercial hydronic multi boiler install with allied electric boilers

Allied 40 kw Electric Boiler

Frequently Asked QUESTIONS

FAQ

Do we deliver?

Yes we do deliver but only within town limits. If you require a delivery out of town we would be happy to do so provided we are scheduled for work in the area.

read details

Avoid using 90* elbows when installing stove pipe

Avoid using 90* elbows when installing stove pipe. Use 45* elbows whenever possible for horizontal installations and 30* elbows for vertical installations. Doing so will ensure better draft.