Banner Images

TIP...
of the Iceberg

Soldering copper

Your solder should always be placed on the opposite side of the pipe where the flame is directed.…

Our PROJECTS

Allied 40 kw Electric Boiler

Commercial hydronic multi boiler install with allied electric boilers

Allied 40 kw Electric Boiler

Frequently Asked QUESTIONS

FAQ

Can I use an existing well for my Geo loop?

The use of an existing well is a possibility but generally not conducive to a proper closed loop installation. The depth of the well and size of casing will be a consideration. Vertical loops are generally drilled by way of a 3' casing to a depth determined by the loop requirement. The well is then filled with a slurry to optimize heat transfer. The number of wells required is calculated as per the heating / cooling load of the home

read details

Make sure you have enough chimney

A rule of thumb for determining how much chimney you need for proper woodstove performance is to measure the distance from the bottom of the stove to the top of the chimney (cap) - you should have at least 15 feet.