If you find your faucet not giving you enough water, check the aerator. They are easily removed…
Commercial Boiler replacement
The use of an existing well is a possibility but generally not conducive to a proper closed loop installation. The depth of the well and size of casing will be a consideration. Vertical loops are generally drilled by way of a 3' casing to a depth determined by the loop requirement. The well is then filled with a slurry to optimize heat transfer. The number of wells required is calculated as per the heating / cooling load of the home
read details